The charger is the easy part. What matters is the circuit behind it.


People shop for months for the charger and five minutes for the circuit. It is the other way round.

Summary

  • Level 1 uses an ordinary outlet; Level 2 needs a dedicated circuit.
  • Distance from the panel is a major cost factor.
  • A hardwired Level 2 installation requires a permit and inspection.

Key Takeaways

  • Level 2 is a large, continuous load and is treated accordingly.
  • Panel capacity, not panel space, is the usual constraint.
  • Load management can sometimes avoid a service upgrade.

Most of the decisions people agonise over, which brand, which features, matter far less than the three things that determine the job: where the car parks, what your panel can supply, and how far apart those two things are.

Level 1 versus Level 2

Level 1 is the cord that came with the car plugged into an ordinary outlet. No installation, very slow. For someone driving a short commute it can genuinely be enough, and it is worth being honest about whether it already covers your use.

Level 2 runs on a 240-volt dedicated circuit, like a dryer or a range, and is dramatically faster. This is what most people mean by installing a charger, and it is real electrical work: a new circuit, correctly sized, from the panel to where the car parks.

Why it is treated as a continuous load

EV charging runs at high current for hours at a time. The code handles continuous loads differently from intermittent ones, which affects how the circuit must be sized. This is a large part of why a charger that advertises a given current needs a circuit rated higher than that number.

The three cost drivers

Distance. Panel in the garage and the car parked ten feet away is a short run. Panel on the far side of the house with the car outside means a long run, possibly through finished walls or under a slab. This is usually the single largest variable.

Capacity. Not whether there is a free breaker space, but whether the service can actually supply the load. This needs a load calculation.

Mounting and path. Surface-run conduit in an unfinished garage is straightforward. Fishing through finished walls, or getting outside to a detached garage or carport, is more involved.

If capacity is short

A service upgrade is one answer but not the only one. Most Level 2 chargers can be configured to draw less current, trading some charging speed for a smaller circuit. There are also load management systems that let a charger share capacity with other large loads, backing off automatically when the house is busy. Either can be considerably cheaper than upgrading a service, and both are worth asking about before accepting that an upgrade is required.

Permits

A hardwired Level 2 installation is permitted work, and that is a good thing rather than a hurdle. It means an inspector verifies the circuit is sized correctly for a load that will run for hours, unattended, overnight, for years. Skipping it to save a few dollars is a poor trade, and unpermitted work surfaces when you sell.

Jarrett PageMaster Electrician
Published April 24, 2026 5 min read
Share

Need this done right?

Jarrett Page has 30 years in the trade and works Dallas-Fort Worth personally.

Call 972-998-3409
Page One Assistant